SAHARA over the years collaborated with distinguished
customers on esteemed projects across Middle East
Our expertise and dedication to quality has established itself as a leading provider of innovative solutions in the field of temporary power generation, dewatering, pumping, and related services
With nearly two decades of industry experience, we have consistently delivered turnkey high-quality products
and services that meet the evolving needs of our customers across various sectors
LIQUID MUD PLANT “LMP”
RAS AL KHAIMAH
For the oilfield drilling well site liquid mud plant project in Ras Al Khaimah, our team successfully rented, managed the sites requirement for temporary power generators, air compressors, diesel storage, mud and brine pumping services for 1 year above duration.
PROJECTS HIGHLIGHT SHOWCASE ONLY SMALL SECTION OF JOB DONE AND OUR TEAM’S COMMITMENT TO
DELIVERING QUALITY CUSTOM SOLUTIONS.
LIQUID MUD PLANT “LMP”
RAS AL KHAIMAH
For the oilfield drilling well site liquid mud plant project in Abu Dhabi, our team successfully rented, managed the sites requirement for temporary power generators, air compressors, diesel storage, mud and brine pumping services for 1.5 year above duration.
STORM WATER PROJECT
DUBAI
We played a crucial role during 2024 managing storm water flooding in Dubai, our team successfully deployed large fleet of high flow pumps and managed the sites requirements for storm water drainage and flood mitigation.
STORM WATER PROJECT
ABU DHABI
We played a crucial role during 2024 managing storm water flooding in Abu Dhabi, our team successfully deployed large fleet of high flow pumps and managed the sites requirements for storm water drainage and flood mitigation.
SAHARA OWNS A LARGE FLEET OF MODERN EQUIPMENT’S AND EXPERTISE TO MANAGE TEMPORARY MOBILE POWER GENERATION, STORAGE, PUMPING MUD, SLURRY AND GROUND WATER PROJECTS ACROSS MIDDLE EAST.
STORAGE TANKS HYDROTEST PROJECT
ABU DHABI
Deployed large fleet of 21,000 USG / 500BBL mobile
cylindrical storage tanks looped together with hose and
high flow jetting pumps for hydrotesting storage tanks.
PIPELINE HYDROTEST PROJECT
DUBAI
Constructed temporary water storage farm
at site by deploying large fleet of 21,000
USG / 500BBL mobile storage tanks looped
together with large diameter hose along
with high flow pumps and jetting pumps for
hydrotesting large diameter pipeline